
Dell PowerScale Maintenance v2
Domain 2Objective 3
Process an Incoming FRU Request POWERSCALE-MAINTENANCE Practice Questions (Page 2)
Part of the PowerScale Hardware Maintenance domain, which accounts for 25% of the POWERSCALE-MAINTENANCE exam.
23questions here
5free pages
5concepts
25%of the exam
Questions 6–10
- 6
A support engineer is processing a FRU request for a PowerScale F800 node. The requested part is not in the local inventory. What is the correct action?
Select an answer first - 7
A support engineer is processing a proactive FRU request for a node's NIC in a PowerScale F800 cluster. The part number in the request is for a NIC that is listed as compatible with F800 nodes. However, the engineer notices that the customer's node has a different NIC firmware version than what is listed in the compatibility matrix. What should the engineer do?
Select an answer first - 8
A PowerScale support engineer receives a service request indicating that a drive is predicted to fail based on telemetry analysis, and a replacement is needed before an actual failure occurs. Which type of FRU request does this represent?
Select an answer first - 9
When documenting a FRU request in the tracking system, what should be updated to reflect the current state of the request?
Select an answer first - 10
A PowerScale customer calls support to report that a node's battery backup unit (BBU) has failed and the node is currently running on a single BBU. The customer provides the node serial number and the part number from the failed BBU. The engineer checks the tracking system and sees no prior request for this BBU. How should the engineer classify this FRU request?
Select an answer first
Finished these 5 questions?
Review the revealed explanations, or continue through the curriculum.
Free Basic Practice is a study aid with revealable answers — not a scored exam. Examers.io is independent and not affiliated with or endorsed by Dell Technologies. “POWERSCALE-MAINTENANCE” is a trademark of its owner, used for identification only.