
Dell PowerSwitch Data Center Deploy
Domain 3Objective 4
Configure and Verify the Operation of UFD in OS10 POWERSWITCH-DATA-CENTER-DEPLOY Practice Questions (Page 4)
Part of the Link Redundancy domain, which accounts for 20% of the POWERSWITCH-DATA-CENTER-DEPLOY exam.
19questions here
4free pages
4concepts
20%of the exam
Questions 16–19
- 16
A switch has UFD configured with two uplinks and four downlinks. One uplink fails. What is the expected behavior of the downlink ports?
Select an answer first - 17
A network architect is designing a data center with two ToR switches, each with multiple uplinks to the core. The architect wants to use UFD to ensure that if a ToR loses ALL of its uplinks, the downlink ports are disabled. However, the architect is concerned about the impact of UFD on server NIC teaming. What is the primary benefit of UFD in this scenario?
Select an answer first - 18
An engineer has configured UFD on a switch and wants to confirm that the configuration is correct before deploying it. The engineer wants to see the exact UFD configuration, including which ports are uplinks and which are downlinks. Which command provides this information?
Select an answer first - 19
When configuring a UFD group in OS10, which command is used to designate an interface as an uplink?
Select an answer first
Finished these 4 questions?
Review the revealed explanations, or continue through the curriculum.
No more pagesBack to POWERSWITCH-DATA-CENTER-DEPLOY
Free Basic Practice is a study aid with revealable answers — not a scored exam. Examers.io is independent and not affiliated with or endorsed by Dell Technologies. “POWERSWITCH-DATA-CENTER-DEPLOY” is a trademark of its owner, used for identification only.