Questions 11–15
- 11
After a UFD group has disabled its downlink ports due to an uplink failure, how do the downlink ports recover?
Select an answer first - 12
What is the primary purpose of Uplink Failure Detection (UFD) in OS10?
Select an answer first - 13
An organization is deploying UFD on a pair of switches that are not in a VLT pair. Each switch has multiple uplinks to different core switches. The requirement is that if ALL uplinks on a switch fail, the downlink ports should be disabled. However, if only one uplink fails, the downlinks should remain active. How should the uplinks be configured in UFD?
Select an answer first - 14
Which command is used to enable UFD globally on an OS10 switch?
Select an answer first - 15
A switch has UFD configured with one uplink and three downlinks. The uplink fails, and the downlinks are disabled. The engineer wants to re-enable the downlinks after the uplink is restored. What is the correct procedure?
Select an answer first