- 1
A switch has UFD configured with two uplinks and four downlinks. Both uplinks fail. What is the expected behavior of the downlink ports?
Select an answer first - 2
What happens to downlink ports in a UFD group when all uplink ports in that group fail?
Select an answer first - 3
A network team is planning to deploy UFD in a data center. They have a mix of servers with dual NICs connected to two different switches. The goal is to ensure that if a switch loses its uplink, the servers connected to that switch will fail over to the other switch. How does UFD facilitate this failover?
Select an answer first - 4
Which show command displays the status of UFD groups and their associated uplink and downlink ports?
Select an answer first - 5
An engineer is verifying UFD operation after a failure event. The 'show ufd' command shows that the uplink is up, but the downlinks are still disabled. The engineer wants to confirm that the downlinks are disabled due to UFD and not another reason. Which additional command output would help confirm this?
Select an answer first
Finished these 5 questions?
Review the revealed explanations, or continue through the curriculum.
Free Basic Practice is a study aid with revealable answers — not a scored exam. Examers.io is independent and not affiliated with or endorsed by Dell Technologies. “POWERSWITCH-DATA-CENTER-DEPLOY” is a trademark of its owner, used for identification only.