Questions 11–15

  1. 11application · medium

    A stack of four OS6 switches has members numbered 1 through 4. The administrator wants to replace member 3 with a new switch. The new switch is currently set to member number 1. What is the correct procedure?

    Select an answer first
  2. 12foundation · easy

    Which CLI command is used to assign a specific member number to a switch in an OS6 stack?

    Select an answer first
  3. 13expert · hard

    In a three-member OS6 stack, the master switch fails. The standby takes over, but the network team notices that the stack's management IP address is now unreachable from the management VLAN. The stack links are up and all members show as online. What is the most likely cause?

    Select an answer first
  4. 14foundation · easy

    A stack member shows as 'offline' in the output of 'show stack'. What is the FIRST step to troubleshoot this issue?

    Select an answer first
  5. 15expert · hard

    An OS6 stack has two members. Member 1 is the master, and member 2 is the standby. The administrator is performing a firmware upgrade. They upgrade member 1 first, and then member 2. After the upgrade, member 2 does not rejoin the stack. What is the most likely cause?

    Select an answer first