Questions 16–19
- 16
A network architect is designing a high-availability data center fabric. They are considering using UFD on the ToR switches. The architect is concerned about a scenario where a ToR switch loses one of its two uplinks, but the other uplink remains operational. The architect wants to ensure that this partial failure does not cause unnecessary server failover. How does UFD handle this scenario?
Select an answer first - 17
An engineer is configuring UFD on a Dell PowerSwitch and has created an uplink-state group. They have assigned two ports as upstream and four ports as downstream. After a test where they shut down both upstream ports, the downstream ports were correctly disabled. However, after bringing the upstream ports back up, the downstream ports remain disabled. What is the most likely reason for this?
Select an answer first - 18
What happens to downstream ports when an uplink failure is detected by UFD?
Select an answer first - 19
Which component of UFD is responsible for detecting the failure of an uplink?
Select an answer first
Finished these 4 questions?
Review the revealed explanations, or continue through the curriculum.
No more pagesBack to POWERSWITCH-DATA-CENTER-DEPLOY
Free Basic Practice is a study aid with revealable answers — not a scored exam. Examers.io is independent and not affiliated with or endorsed by Dell Technologies. “POWERSWITCH-DATA-CENTER-DEPLOY” is a trademark of its owner, used for identification only.