Questions 6–10
- 6
What is the primary purpose of Virtual Link Trunking (VLT) in a Dell PowerSwitch data center deployment?
Select an answer first - 7
What is the purpose of the VLT backup link?
Select an answer first - 8
A data center is deploying a pair of Dell PowerSwitch switches as a VLT pair to connect multiple servers using LACP. The goal is to provide active-active load balancing and redundancy for the server links. Which benefit does VLT provide in this scenario?
Select an answer first - 9
Which requirement must be met for the VLT interconnect (VLTi) to function correctly?
Select an answer first - 10
A network engineer is designing a VLT deployment with two Dell PowerSwitch switches. The VLT interconnect (VLTi) will be used to carry both control-plane traffic (e.g., VLT keepalive and LACP) and data-plane traffic between the peers. The engineer wants to ensure that the VLTi does not become a loop in the L2 topology. Which statement about the VLTi is correct?
Select an answer first