  1. 6application · medium

    A data center team is deploying two OS10 switches as VLT peers. They have connected the two switches with a 40GbE link for the VLT interconnect and a separate management network link for backup. They have created a VLT domain and assigned a domain ID. Which additional configuration step is required to complete the VLT domain setup before creating VLT LAGs?

    Select an answer first
  2. 7application · medium

    An administrator has configured VLT on a pair of OS10 switches. They want to verify that the VLT interconnect is operational and that both nodes are in a steady state. Which command provides the most direct confirmation of the VLT domain status and peer connectivity?

    Select an answer first
  3. 8foundation · easy

    Which OS10 command is used to verify the operational status of a VLT LAG, such as whether it is up and forwarding traffic?

    Select an answer first
  4. 9foundation · easy

    In OS10, which command is used to designate a port-channel as the VLT interconnect (peer link) between the two VLT nodes?

    Select an answer first
  5. 10foundation · easy

    What is the role of a VLT LAG in an OS10 VLT domain?

    Select an answer first