Dell PowerSwitch Data Center Deploy
Domain 3Objective 2
Configure and Verify the Operation of VLT in OS10 POWERSWITCH-DATA-CENTER-DEPLOY Practice Questions (Page 2)
Part of the Link Redundancy domain, which accounts for 20% of the POWERSWITCH-DATA-CENTER-DEPLOY exam.
20questions here
4free pages
5concepts
20%of the exam
Questions 6–10
- 6
A data center team is deploying two OS10 switches as VLT peers. They have connected the two switches with a 40GbE link for the VLT interconnect and a separate management network link for backup. They have created a VLT domain and assigned a domain ID. Which additional configuration step is required to complete the VLT domain setup before creating VLT LAGs?
Select an answer first - 7
An administrator has configured VLT on a pair of OS10 switches. They want to verify that the VLT interconnect is operational and that both nodes are in a steady state. Which command provides the most direct confirmation of the VLT domain status and peer connectivity?
Select an answer first - 8
Which OS10 command is used to verify the operational status of a VLT LAG, such as whether it is up and forwarding traffic?
Select an answer first - 9
In OS10, which command is used to designate a port-channel as the VLT interconnect (peer link) between the two VLT nodes?
Select an answer first - 10
What is the role of a VLT LAG in an OS10 VLT domain?
Select an answer first
Finished these 5 questions?
Review the revealed explanations, or continue through the curriculum.