Dell ECS Deploy
Domain 2Objective 1
Prepare the Site and ECS System for Installation ECS-DEPLOY Practice Questions (Page 4)
Part of the ECS Implementation domain, which accounts for 36% of the ECS-DEPLOY exam.
24questions here
5free pages
5concepts
36%of the exam
Questions 16–20
- 16
Why is labeling cables important during ECS rack setup?
Select an answer first - 17
A technician is racking ECS nodes in a data center. The technician notices that the rack has a non-standard depth and the cable management arms are not included. The technician must ensure proper rack mounting and cabling. What should the technician do?
Select an answer first - 18
Which site requirement must be verified before installing an ECS system?
Select an answer first - 19
Before installing an ECS system, an administrator performs pre-installation checks. The administrator verifies that all nodes are powered on, network cables are connected, and the management switch is reachable. However, the ECS installation wizard reports that one node is not responding. What should the administrator check next?
Select an answer first - 20
An administrator is preparing to deploy an ECS system and has received the hardware from Dell. Before starting the installation, the administrator wants to verify that all required components are present and that the system meets the prerequisites. Which action should the administrator take first?
Select an answer first