
Dell ECS Deploy
Domain 2Objective 1
Prepare the Site and ECS System for Installation ECS-DEPLOY Practice Questions (Page 3)
Part of the ECS Implementation domain, which accounts for 36% of the ECS-DEPLOY exam.
24questions here
5free pages
5concepts
36%of the exam
Questions 11–15
- 11
Which pre-installation check verifies that the site can support the ECS system?
Select an answer first - 12
What network prerequisite is typically required at an ECS installation site?
Select an answer first - 13
A data center is being prepared for an ECS installation. The room has a cooling capacity of 100,000 BTU/hr, but the ECS nodes will generate 120,000 BTU/hr of heat. The administrator must ensure the site meets cooling requirements. What should the administrator do?
Select an answer first - 14
A company is preparing a site for an ECS installation. The site has a limited power budget, and the ECS nodes require a total of 20 kW. The facility can provide 15 kW. The administrator must find a way to meet the power requirement. What should the administrator do?
Select an answer first - 15
A data center is being prepared for an ECS installation. The facility has a single-phase power supply, but the ECS nodes require three-phase power. The administrator must ensure the site meets power requirements. What should the administrator do?
Select an answer first
Finished these 5 questions?
Review the revealed explanations, or continue through the curriculum.
Free Basic Practice is a study aid with revealable answers — not a scored exam. Examers.io is independent and not affiliated with or endorsed by Dell Technologies. “ECS-DEPLOY” is a trademark of its owner, used for identification only.