Part of the Securing the ICS Network domain, which makes up ~16% of our current practice bank. EC-Council does not publish an official question count, but from its 120-minute exam (~50–80 total, ~8–13 in this domain), expect 1–2 from this objective — we provide 45 practice questions to prepare you well beyond it. (estimate)
45questions here
9free pages
7concepts
Questions 41–45
- 41
A hospital has a legacy building automation system (BAS) that controls HVAC and is connected to the IT network for remote monitoring. The BAS controller runs an outdated firmware with known vulnerabilities. The hospital wants to isolate the BAS from the IT network but still allow the facilities team to monitor and adjust settings remotely. Which segmentation approach is most appropriate?
Select an answer first - 42
Which of the following is a lifecycle strategy for a legacy system?
Select an answer first - 43
A wastewater plant has a legacy SCADA server running Windows Server 2003 with a known critical vulnerability in its web interface. The server is in a DMZ that is accessible from the corporate network. The vendor is out of business, and a replacement is planned in 12 months. The plant has deployed a network IPS with virtual patching signatures for the vulnerability. However, the IPS is placed at the DMZ boundary, and the corporate network can still reach the SCADA server directly. What is the MOST significant remaining risk that the virtual patching does NOT address?
Select an answer first - 44
A water treatment facility has a 15-year-old HMI running Windows XP that communicates with a PLC over a flat network. The HMI cannot be patched or replaced this quarter. The security team needs to reduce the risk of a remote attacker exploiting the HMI's known vulnerabilities while keeping the HMI functional. Which approach best addresses the immediate risk?
Select an answer first - 45
A manufacturing plant has a legacy CNC machine controller running Windows NT 4.0. The controller is critical for production and cannot be replaced for 18 months. The plant has a limited budget and must choose between two risk-reduction projects: (1) deploying a network IPS with virtual patching for known Windows NT vulnerabilities, or (2) segmenting the controller onto a dedicated VLAN with a firewall. The controller is currently on the same network as the plant's engineering workstations, which have internet access. Which project should the plant prioritize, and why?
Select an answer first
Finished these 5 questions?
Review the revealed explanations, or continue through the curriculum.
No more pagesBack to ICSSCADA
Free Basic Practice is a study aid with revealable answers — not a scored exam. Examers.io is independent and not affiliated with or endorsed by EC-Council. “ICSSCADA” is a trademark of its owner, used for identification only.