Mitigating the Risk of Legacy Machines ICSSCADA Practice Questions (Page 3)

Part of the Securing the ICS Network domain, which makes up ~16% of our current practice bank. EC-Council does not publish an official question count, but from its 120-minute exam (~50–80 total, ~8–13 in this domain), expect 1–2 from this objective — we provide 45 practice questions to prepare you well beyond it. (estimate)

45questions here
9free pages
7concepts

Questions 11–15

  1. 11foundation · easy

    Which detection mechanism is commonly used to monitor legacy systems for intrusions?

    Select an answer first
  2. 12expert · hard

    A food processing plant has a legacy PLC that controls the bottling line. The PLC runs a proprietary real-time OS and communicates via a proprietary protocol over Ethernet. The PLC has known unpatched vulnerabilities, but the vendor has announced end-of-life and will not provide patches. The plant has a strict production schedule and cannot afford a full line shutdown for more than 4 hours. A replacement PLC is available but requires rewiring and re-engineering of the control logic, estimated at 3 weeks. The plant manager wants to reduce risk immediately. Which strategy BEST balances immediate risk reduction with the long-term need to eliminate the legacy system?

    Select an answer first
  3. 13expert · hard

    A refinery has a legacy distributed control system (DCS) that is vulnerable to a known exploit that uses a specific sequence of packets on a port that is also used for legitimate DCS communications. The security team cannot patch the DCS and cannot block the port. They have deployed an inline IPS. What should the IPS rule do to effectively virtual patch the vulnerability?

    Select an answer first
  4. 14expert · hard

    A regional water utility operates a legacy SCADA system that includes a Windows NT-based HMI and a PLC network. The HMI is connected to both the corporate IT network (for business reporting) and the PLC network. The HMI cannot be patched or replaced for 18 months. The utility has a limited budget and cannot afford a full network redesign. Which combination of compensating controls would most effectively reduce the risk posed by the HMI?

    Select an answer first
  5. 15application · medium

    A power utility has a legacy remote terminal unit (RTU) that communicates using a proprietary protocol over a serial link to a master station. The RTU's firmware is outdated and cannot be updated. Which risk assessment factor is most critical to consider when evaluating the RTU's exposure?

    Select an answer first