Questions 16–20
- 16
Before beginning any hardware maintenance procedure on a PowerScale cluster, which of the following is a required preliminary check?
Select an answer first - 17
A technician is preparing to replace a node chassis in a data center. The technician has the replacement chassis and the necessary tools, but the anti-static wrist strap is missing. What should the technician do?
Select an answer first - 18
An administrator is about to replace a failed node in a PowerScale cluster. The administrator has verified the cluster is healthy and has the replacement node ready. What additional step should be taken before the replacement?
Select an answer first - 19
Which of the following should be included in a configuration backup before hardware maintenance?
Select an answer first - 20
A technician is preparing to replace a node in a PowerScale cluster. The data center is undergoing a cooling system test, and the temperature in the room is higher than normal. The technician has all the required tools and parts. What should the technician do?
Select an answer first