Part of the 2.0 Common Service Tasks and Tools domain, which accounts for 15% of the 800-150 exam. Cisco does not publish an official question count, but from its 120-minute exam (~50–80 total, ~8–12 in this domain), expect 1–1 from this objective — we provide 8 practice questions to prepare you well beyond it. (estimate)
8questions here
2free pages
3concepts
15%of the exam
Questions 1–5
- 1
A technician needs to verify that a switch port can transmit and receive data without connecting to another device. Which tool should be used?
Select an answer first - 2
A technician is troubleshooting a user's workstation that cannot reach the network. The switch port LED is solid green, but the link light on the workstation's NIC is off. The technician swaps the patch cable with a known-good cable, but the NIC link light remains off. What should the technician do next?
Select an answer first - 3
A technician is verifying physical layer connectivity on a switch port. Which two indicators together confirm that the physical layer is functioning correctly?
Select an answer first - 4
A technician is troubleshooting a link that is down between two switches. The cable run is about 90 meters and passes through a patch panel. The technician wants to determine if the cable itself is faulty or if the issue is with the switch ports. Which tool should the technician use first?
Select an answer first - 5
A technician is checking a workstation's network connection. Which action directly verifies physical layer connectivity?
Select an answer first