Part of the Apstra Design Phase domain, which makes up ~23% of our current practice bank. Juniper Networks does not publish an official question count, but from its 90-minute exam (~35–60 total, ~8–14 in this domain), expect 1–2 from this objective — we provide 10 practice questions to prepare you well beyond it. (estimate)
10questions here
2free pages
4concepts
Questions 1–5
- 1
When selecting a spine switch model, which two features are most important to ensure the switch can handle the required capacity and provide redundancy?
Select an answer first - 2
A fabric has 20 leaf switches, each with four 100GbE uplinks to the spine. The design requires a 2:1 oversubscription ratio. What is the total spine capacity required?
Select an answer first - 3
A fabric has 10 leaf switches, each with two 40GbE uplinks. The desired oversubscription ratio is 4:1. What is the total spine capacity needed?
Select an answer first - 4
In a Clos fabric, what is the primary role of spine switches?
Select an answer first - 5
Which two methods can be used to scale spine capacity in an existing Clos fabric?
Select an answer first
Finished these 5 questions?
Review the revealed explanations, or continue through the curriculum.
Free Basic Practice is a study aid with revealable answers — not a scored exam. Examers.io is independent and not affiliated with or endorsed by Juniper Networks. “JN0-481” is a trademark of its owner, used for identification only.