Part of the Change, Vulnerability, and Incident Management domain, which makes up ~19% of our current practice bank. GIAC (SANS) does not publish an official question count, but from its 180-minute exam (~70–120 total, ~13–23 in this domain), expect 7–12 from this objective — we provide 44 practice questions to prepare you well beyond it. (estimate)

44questions here
9free pages
5concepts

Questions 36–40

  1. 36application · medium

    A vulnerability assessment of a hospital's building management system (BMS) reveals that several workstations have outdated antivirus definitions. The workstations are used to monitor HVAC controls and are not connected to the internet. The assessment also found that staff frequently use USB drives to transfer maintenance logs. What is the most likely reason the antivirus definitions are outdated?

    Select an answer first
  2. 37expert · hard

    A pipeline company allows field technicians to use their own laptops for remote diagnostics. The laptops are used across multiple sites and connect to the corporate network via VPN. The company is considering a policy to require all laptops to be company-owned and managed. What is the most significant trade-off to consider?

    Select an answer first
  3. 38application · medium

    A security analyst notices that a configuration monitoring alert fired for an engineering workstation in a power plant. The alert indicates that a new file was added to the startup folder. The workstation was recently used by a vendor technician who connected a USB drive to install a diagnostic tool. What should the analyst do first?

    Select an answer first
  4. 39application · medium

    A vulnerability assessment of a natural gas pipeline's SCADA network identified a missing security patch on a historian server. The patch requires a reboot, which would interrupt data collection for several hours. The change management board has a policy that all patches must be tested in a lab before production deployment. What is the best course of action?

    Select an answer first
  5. 40application · medium

    A food processing plant uses USB drives to update the recipe files on its packaging line controllers. The plant has experienced a malware infection traced to a USB drive. The IT manager wants to maintain the ability to update recipes but reduce the risk. What is the best control to implement?

    Select an answer first