Part of the Change, Vulnerability, and Incident Management domain, which makes up ~19% of our current practice bank. GIAC (SANS) does not publish an official question count, but from its 180-minute exam (~70–120 total, ~13–23 in this domain), expect 7–12 from this objective — we provide 44 practice questions to prepare you well beyond it. (estimate)
44questions here
9free pages
5concepts
Questions 11–15
- 11
A cybersecurity analyst at a hydroelectric facility is responsible for configuration monitoring. The facility uses a centralized SIEM to collect logs from the control network. A recent vulnerability assessment identified that many engineering workstations have unauthorized software installed. The analyst suspects that technicians are using USB drives to install tools. The SIEM does not monitor USB activity. What is the most effective way to detect and prevent this behavior?
Select an answer first - 12
A security analyst at a power generation facility notices that configuration monitoring reports a change to the firewall rule base on a critical control network segment. The change was not part of any approved change request. What should the analyst do first?
Select an answer first - 13
A water utility has a policy that all removable media must be encrypted and centrally managed. An employee is found using a personal USB drive to transfer water quality reports from a control system workstation to an office computer. What is the most appropriate action?
Select an answer first - 14
A vulnerability assessment of a transportation control system is planned. The system includes both permanent assets and transient assets such as laptops used by maintenance staff. The assessment team wants to ensure all assets are covered. What is the most important consideration?
Select an answer first - 15
A power utility is planning a vulnerability assessment of its substation automation system. The assessment will include active scanning of intelligent electronic devices (IEDs). The utility has a strict change management process that requires all changes to be approved. The assessment team wants to scan during normal operations to avoid overtime costs. What is the most important factor to consider before approving the scan?
Select an answer first
Finished these 5 questions?
Review the revealed explanations, or continue through the curriculum.
Free Basic Practice is a study aid with revealable answers — not a scored exam. Examers.io is independent and not affiliated with or endorsed by GIAC (SANS). “GCIP” is a trademark of its owner, used for identification only.