Dell PowerScale Maintenance v2
Domain 3Objective 3
Describe Requirements and Steps for Installing the Rack and Subcomponents POWERSCALE-MAINTENANCE Practice Questions (Page 3)
Part of the PowerScale Hardware Installation domain, which accounts for 25% of the POWERSCALE-MAINTENANCE exam.
22questions here
5free pages
3concepts
25%of the exam
Questions 11–15
- 11
What is the first step in the PowerScale rack installation process?
Select an answer first - 12
A company is installing a PowerScale rack in a raised-floor data center. The floor tiles are rated to support 500 kg each, and the fully loaded rack weighs 450 kg. The installation team is concerned about the rack's stability and the floor's load-bearing capacity. What should they do to ensure a safe installation?
Select an answer first - 13
A data center is installing a PowerScale rack in a room with limited floor space. The rack must be placed against a wall, but the rear of the rack requires 80 cm of clearance for airflow and cable access. The room has only 60 cm of clearance behind the rack. What is the best course of action?
Select an answer first - 14
A company is installing a PowerScale rack in a data center that has a seismic bracing requirement due to the region's earthquake risk. What must the installation team do to comply with this requirement?
Select an answer first - 15
What safety requirement must be observed when lifting a fully populated PowerScale rack?
Select an answer first