
Dell PowerScale Design v2
Domain 4Objective 1
Account for Specific Customer Continuity and Protection Requirements POWERSCALE-DESIGN-V2 Practice Questions (Page 1)
Part of the PowerScale Management, Identity Management, and Advanced Applications domain, which accounts for 24% of the POWERSCALE-DESIGN-V2 exam.
22questions here
5free pages
7concepts
24%of the exam
Questions 1–5
- 1
A customer runs a PowerScale cluster with 6 nodes and uses N+2:1 protection. They are planning to add a new workload that requires the ability to lose any two nodes without data unavailability. The cluster currently has 20% free space. What should the design recommend?
Select an answer first - 2
A customer needs to protect against a complete site loss and must be able to fail over to a secondary site with minimal data loss. Which PowerScale feature should be included in the design?
Select an answer first - 3
A customer requires protection against the failure of a single node in a 5-node PowerScale cluster. Which protection level meets this requirement with the least storage overhead?
Select an answer first - 4
A customer is defining their business continuity requirements for a PowerScale environment. Which input is most directly used to determine the appropriate protection strategy?
Select an answer first - 5
Which statement correctly describes the relationship between backup frequency and recovery point objective (RPO)?
Select an answer first
Finished these 5 questions?
Review the revealed explanations, or continue through the curriculum.
Free Basic Practice is a study aid with revealable answers — not a scored exam. Examers.io is independent and not affiliated with or endorsed by Dell Technologies. “POWERSCALE-DESIGN-V2” is a trademark of its owner, used for identification only.