Questions 6–10
- 6
After replacing a failed fan module in a PowerMax array, the technician wants to confirm the replacement was successful. Which verification step is MOST appropriate?
Select an answer first - 7
A technician is preparing to replace a failed battery backup unit (BBU) in a PowerMax array. The technician has the replacement BBU and has reviewed the procedure. However, the technician notices that the replacement BBU has a different part number than the failed unit. What should the technician do?
Select an answer first - 8
Before replacing a failed SFP (small form-factor pluggable) transceiver in a PowerMax array, the technician must ensure which prerequisite is met?
Select an answer first - 9
A technician is preparing to replace a failed cooling fan in a PowerMax array. The technician has the replacement fan and has reviewed the procedure. Which additional safety precaution is MOST important?
Select an answer first - 10
A storage administrator is planning to replace a failed SFP transceiver in a PowerMax array. The administrator has a replacement SFP, but it is from a different vendor than the original. What should the administrator do?
Select an answer first