Questions 1–5
- 1
A fabric diagram for a PowerMax 8500 shows a direct connection between the two storage processors (SP-A and SP-B). What is the primary purpose of this inter-SP connection?
Select an answer first - 2
Which component receives power from the power distribution unit (PDU) in a PowerMax 2500 or 8500 system?
Select an answer first - 3
A facility manager is planning the power layout for a new PowerMax 2500 installation. The array's base enclosure has two power supplies. To meet the manufacturer's redundancy requirements, what is the minimum number of separate power circuits that must be run to the enclosure?
Select an answer first - 4
In a PowerMax 2500 or 8500 fabric diagram, what does a line connecting a front-end port to a storage processor typically represent?
Select an answer first - 5
During a PowerMax 8500 installation, the administrator notices that the power cable for one of the power supplies is routed alongside a high-voltage AC line in the same cable tray. What is the primary concern with this routing?
Select an answer first