Part of the Network implementation domain, which makes up ~11% of our current practice bank. CompTIA does not publish an official question count, but from its 90-minute exam (~35–60 total, ~4–7 in this domain), expect 1–2 from this objective — we provide 28 practice questions to prepare you well beyond it. (estimate)
28questions here
6free pages
8concepts
Questions 16–20
- 16
A network technician is installing cabling for a new office that will connect workstations to a central switch located about 80 meters away. The cable will run through plenum spaces. Which cable type and rating should the technician select?
Select an answer first - 17
A network technician is setting up a new patch panel in an IDF. The technician has terminated the cables and is now ready to connect the patch panel to the switch. What is the best practice for connecting the patch panel to the switch?
Select an answer first - 18
Why is it important to maintain proper temperature and humidity levels in a server room?
Select an answer first - 19
What is the purpose of grounding and bonding in a network installation?
Select an answer first - 20
What is the purpose of using cage nuts when mounting equipment in a rack with square holes?
Select an answer first