Part of the Customer Network Design Requirements domain, which makes up ~21% of our current practice bank. Juniper Networks does not publish an official question count, but from its 90-minute exam (~35–60 total, ~7–13 in this domain), expect 1–2 from this objective — we provide 19 practice questions to prepare you well beyond it. (estimate)
19questions here
4free pages
2concepts
Questions 1–5
- 1
A university research lab is designing a new high-performance computing (HPC) network. The proposal must include the design of the InfiniBand fabric and the configuration of the compute nodes. The lab has a strict requirement that the proposal must be reviewed by the university's ethics committee because the research involves sensitive data. The ethics committee requests that the proposal include a detailed data flow diagram showing how data moves between the compute nodes and the storage system. The design team is concerned that this diagram will reveal proprietary research methods. What is the most appropriate action?
Select an answer first - 2
A city government is designing a new network for its public safety department. The proposal must include the core and distribution switches, but the RFP explicitly states that the design of the radio communication system is out of scope. The design team prepares the proposal and includes a section on radio system integration because they believe it is important for the overall solution. What should the team do?
Select an answer first - 3
A university is designing a new campus network for a research building. The project sponsor has a hard budget of $500,000 and a deadline of 6 months. The design team has proposed a dual-core architecture with redundant distribution switches and full 10GbE access ports. After reviewing the design, the sponsor notes that the budget will not cover the proposed hardware and asks the team to revise the proposal. Which approach best respects the proposal boundary while meeting the sponsor's constraint?
Select an answer first - 4
A managed service provider (MSP) is responding to an RFP from a retail chain to design a new SD-WAN architecture. The RFP states that the proposal must cover the design of the WAN overlay and the configuration of the hub routers, but it explicitly excludes the design of the local LAN switching at each store. The MSP's solution architect prepares the proposal and includes a section on store-level switch VLAN design. What should the architect do to stay within the proposal boundary?
Select an answer first - 5
A retail chain is designing a new network for its 500 stores. The proposal must include the design of the SD-WAN architecture and the configuration of the branch routers. The customer has a requirement that the proposal must be completed within 4 weeks and that the total cost must not exceed $1 million. The design team realizes that the full SD-WAN design for all 500 stores cannot be completed within the 4-week timeline. What is the most appropriate action?
Select an answer first