Part of the Systems Security Engineering Foundations domain, which accounts for 24% of the ISSEP exam. ISC2 does not publish an official question count, but from its 180-minute exam (~70–120 total, ~17–29 in this domain), expect 3–5 from this objective — we provide 28 practice questions to prepare you well beyond it. (estimate)
28questions here
6free pages
10concepts
24%of the exam
Questions 6–10
- 6
What does Mean Time Between Failures (MTBF) measure for a repairable security system component?
Select an answer first - 7
In a Monte Carlo simulation for project schedule estimation, what is the typical output?
Select an answer first - 8
What does the term 'overhead' refer to in the context of personnel cost calculation for security engineering projects?
Select an answer first - 9
Why is it important to distinguish between repair MTTR and recovery MTTR in disaster recovery planning?
Select an answer first - 10
A security engineering manager is developing a cost estimate for a new security operations center. The manager has historical data from three similar projects with costs of $1.2M, $1.5M, and $1.8M. The new project is expected to be 20% larger in scope. The manager also has a detailed list of required personnel and their loaded rates. Which estimation approach would provide the most defensible estimate?
Select an answer first
Finished these 5 questions?
Review the revealed explanations, or continue through the curriculum.
Free Basic Practice is a study aid with revealable answers — not a scored exam. Examers.io is independent and not affiliated with or endorsed by ISC2. “ISSEP” is a trademark of its owner, used for identification only.