Part of the Recovery and Information Protection domain, which makes up ~15% of our current practice bank. GIAC (SANS) does not publish an official question count, but from its 180-minute exam (~70–120 total, ~11–18 in this domain), expect 6–9 from this objective — we provide 34 practice questions to prepare you well beyond it. (estimate)
34questions here
7free pages
4concepts
Questions 6–10
- 6
A utility has a recovery plan for its BES Cyber System that has been validated through tabletop exercises for the past three years. The compliance team now requires a higher level of assurance. The operations team is concerned that a full-scale test would require a prolonged outage. The budget allows for a one-time investment in a test environment. What is the most appropriate strategy to increase assurance over time?
Select an answer first - 7
A regional transmission operator is revising its recovery plan testing strategy. The compliance team wants to validate that the recovery procedures for a critical EMS are technically accurate, but they are concerned about disrupting live operations. Which testing method best balances technical validation with minimal operational impact?
Select an answer first - 8
A generation facility's recovery plan for its DCS was last tested 11 months ago. Since then, the facility has migrated from a Windows-based historian to a Linux-based historian, and the recovery plan has been updated accordingly. The compliance calendar shows the annual test is due in one month. What is the most appropriate action?
Select an answer first - 9
A generation owner conducted a tabletop exercise of its recovery plan. During the exercise, the team identified that the contact information for the backup vendor was outdated. The exercise report is being prepared. What should the report include regarding this finding?
Select an answer first - 10
A recovery plan test for a BES Cyber System was conducted, and the test results showed that the recovery time objective (RTO) was exceeded by 30 minutes. The recovery team believes the delay was due to a single vendor's late response. The compliance team must report the results. What is the most appropriate way to report this?
Select an answer first
Finished these 5 questions?
Review the revealed explanations, or continue through the curriculum.
Free Basic Practice is a study aid with revealable answers — not a scored exam. Examers.io is independent and not affiliated with or endorsed by GIAC (SANS). “GCIP” is a trademark of its owner, used for identification only.