Part of the Introduction to ICS/SCADA Network Defense domain, which makes up ~13% of our current practice bank. EC-Council does not publish an official question count, but from its 120-minute exam (~50–80 total, ~7–10 in this domain), expect 1–2 from this objective — we provide 43 practice questions to prepare you well beyond it. (estimate)
43questions here
9free pages
7concepts
Questions 6–10
- 6
A regional airport's baggage handling system uses a mix of legacy and modern PLCs. During a risk identification workshop, the team identifies several potential risks. Which of the following are risks that are specifically relevant to ICS/SCADA environments? (Select all that apply.)
Select an answer first - 7
A hospital's building management system (BMS) controls HVAC and access doors. The IT department wants to conduct a risk assessment of the BMS, but the facilities team is concerned that the assessment might disrupt building operations. What is the best way to conduct the risk assessment without disrupting operations?
Select an answer first - 8
During a risk analysis for a food processing plant, the team examines the possibility of a USB drive carrying malware being plugged into a plant floor HMI. They estimate that such an event occurs about once every two years, and that the resulting production downtime would cost $500,000 per incident. What is the annualized loss expectancy (ALE) for this risk?
Select an answer first - 9
A manufacturing company has a critical production line that relies on a legacy PLC. The PLC has a known vulnerability that could allow an attacker to stop production. The company has three options: (1) patch the PLC, which requires a 4-hour downtime and may void the vendor warranty; (2) install an application whitelisting solution that blocks unauthorized executables; (3) disconnect the PLC from the network, which would require manual operation. Production cannot be stopped for more than 2 hours. Which option best balances security and operational constraints?
Select an answer first - 10
A regional electrical utility is planning to connect its SCADA network to a corporate IT network for better data analytics. Before making the connection, the security manager initiates a risk assessment. What is the primary purpose of this risk assessment in this context?
Select an answer first