Examers.io
ExamsOrganizationsHow it worksPricingHelp & FAQ
EC-Council logo

EC-CouncilICS/SCADA Cybersecurity

Domain 5Objective 4

ISA99 ICSSCADA Practice Questions (Page 8)

Part of the Standards and Regulations for Cybersecurity domain, which makes up ~13% of our current practice bank. EC-Council does not publish an official question count, but from its 120-minute exam (~50–80 total, ~7–10 in this domain), expect 1–2 from this objective — we provide 47 practice questions to prepare you well beyond it. (estimate)

47questions here
10free pages
7concepts

Questions 36–40

  1. 36application · medium

    A chemical plant is updating its OT network. The safety instrumented system (SIS) is in a separate zone from the basic process control system (BPCS). The risk assessment shows that a successful attack on the SIS could cause a toxic release, but the SIS has no direct internet connectivity and is protected by a firewall. The plant wants to assign a security level to the SIS zone. What is the most appropriate way to determine the target security level (SL-T) for the SIS zone?

    Select an answer first
  2. 37application · medium

    An organization is implementing ISA99 system security requirements for a new batch process control system. The system will have multiple operators with different roles. The security team wants to ensure that only authorized operators can change recipe parameters. Which ISA99 foundational requirement is most directly applied by implementing role-based access control on the HMI?

    Select an answer first
  3. 38application · medium

    A chemical plant is performing an ISA99 risk assessment. They have identified a vulnerability in a chemical mixing process that could allow an attacker to alter the mixture ratio, leading to a toxic release. The current system has no authentication on the DCS. Which mitigation would be most aligned with ISA99's risk assessment methodology?

    Select an answer first
  4. 39foundation · easy

    In the ISA99 risk assessment methodology, what is the first step?

    Select an answer first
  5. 40application · medium

    A food and beverage plant is implementing ISA99 zones and conduits. The plant has a packaging line that is controlled by a PLC and a vision system that inspects packages. The vision system is a newer device that supports encrypted communication. The PLC is older and only supports unencrypted communication. The plant wants to place both devices in the same zone. What is the primary consideration when determining if they can be in the same zone?

    Select an answer first
Finished these 5 questions?

Review the revealed explanations, or continue through the curriculum.

Free Basic Practice is a study aid with revealable answers — not a scored exam. Examers.io is independent and not affiliated with or endorsed by EC-Council. “ICSSCADA” is a trademark of its owner, used for identification only.