
Dell VxRail Operate v2
Domain 4Objective 5
Recognize Power Control Operations on a VxRail Cluster VXRAIL-OPERATE-V2 Practice Questions (Page 1)
Part of the Perform Maintenance and Troubleshooting domain, which accounts for 20% of the VXRAIL-OPERATE-V2 exam.
23questions here
5free pages
5concepts
20%of the exam
Questions 1–5
- 1
Which power control operation on a VxRail cluster is most appropriate when you need to reboot all nodes to apply a firmware update?
Select an answer first - 2
A VxRail administrator is planning a graceful shutdown of the cluster for a facility maintenance window. The cluster runs a mix of production and development VMs. What is the impact of the shutdown on the VMs?
Select an answer first - 3
A VxRail cluster was shut down for a long maintenance window. After the maintenance, the administrator powers on the first node and waits for VxRail Manager to become available. However, VxRail Manager does not come up. What should the administrator do next?
Select an answer first - 4
A VxRail cluster is being powered on after a shutdown. The administrator powers on the first node and waits for VxRail Manager to become available. After VxRail Manager is available, the administrator powers on the remaining nodes. However, vCenter Server does not come up. What is the most likely cause?
Select an answer first - 5
Which power control operation on a VxRail cluster is used to bring all nodes and services back online after a planned maintenance window?
Select an answer first
Finished these 5 questions?
Review the revealed explanations, or continue through the curriculum.
Free Basic Practice is a study aid with revealable answers — not a scored exam. Examers.io is independent and not affiliated with or endorsed by Dell Technologies. “VXRAIL-OPERATE-V2” is a trademark of its owner, used for identification only.