Dell VxRail Design
Domain 3Objective 6
Explain the Use of Reference Workloads. VXRAIL-DESIGN Practice Questions (Page 2)
Part of the Determine the Nodes and Node Resources domain, which accounts for 30% of the VXRAIL-DESIGN exam.
17questions here
4free pages
5concepts
30%of the exam
Questions 6–10
- 6
In the context of VxRail design, what is a reference workload?
Select an answer first - 7
A hospital is designing a VxRail cluster for a new electronic health record (EHR) system. The vendor's sizing tool shows a reference workload for 'OLTP database' with 50,000 IOPS, 2 ms latency, and 5 TB capacity. The hospital's actual EHR workload is expected to have 30,000 IOPS, 4 ms latency, and 12 TB capacity. The design team is about to order nodes based on the reference workload. What should the team do first?
Select an answer first - 8
What is the primary role of a reference workload in VxRail design?
Select an answer first - 9
How do different reference workloads map to VxRail node types?
Select an answer first - 10
A VxRail architect is designing a cluster for a customer that will run a mix of VDI and a small database workload. The reference workload for VDI specifies 15,000 IOPS and 5 TB capacity for 500 desktops. The database reference workload specifies 10,000 IOPS and 2 TB capacity. The customer expects 500 desktops and a database that requires 8,000 IOPS and 1 TB. The architect is considering using a single cluster for both workloads. What is the most appropriate approach to determine the total node requirements?
Select an answer first