Questions 1–5
- 1
In a spine-leaf topology, how is high availability typically achieved?
Select an answer first - 2
A data center architect is explaining to a junior engineer the difference between a spine-leaf topology and a three-tier topology. Which statement is accurate?
Select an answer first - 3
A network engineer is configuring a spine-leaf fabric. Each leaf switch has two 40GbE uplinks to two different spine switches. The engineer wants to ensure that if one uplink fails, traffic is automatically rerouted to the other uplink without manual intervention. Which feature should be enabled?
Select an answer first - 4
A data center is being designed with a spine-leaf topology. The architect wants to ensure that if a spine switch fails, the impact is minimized. Which design consideration is most important?
Select an answer first - 5
A large e-commerce company is building a new data center. The workloads are a mix of web servers (north-south traffic) and a distributed database (east-west traffic). The company expects to double its server count every two years. The network team is experienced with both three-tier and spine-leaf designs. Which topology should be chosen?
Select an answer first