Questions 6–10

  1. 6foundation · easy

    How is the VRRP master down timer typically calculated?

    Select an answer first
  2. 7application · easy

    Two OS10 switches are configured for VRRP with the same priority (100). The network team wants Switch A to be the master. What configuration change will ensure Switch A is elected master?

    Select an answer first
  3. 8foundation · easy

    What is the primary purpose of VRRP in an OS10 data center network?

    Select an answer first
  4. 9foundation · easy

    What is the default VRRP priority in OS10?

    Select an answer first
  5. 10application · medium

    Two OS10 switches run VRRP for a gateway. The network team needs failover to occur as quickly as possible when the master switch loses power, but they are concerned about unnecessary master flaps due to brief network hiccups. They decide to reduce the advertisement interval from 1 second to 200 milliseconds. What is the most important additional consideration for this change?

    Select an answer first
Finished these 5 questions?