Questions 1–5
- 1
After a node has joined a PowerScale cluster, which command can be used to verify that the node is now a member of the cluster?
Select an answer first - 2
Which interface can be used to join a node to a PowerScale cluster by running the `isi add` command?
Select an answer first - 3
A storage administrator is adding a new node to an existing PowerScale cluster running OneFS 9.4. The new node was shipped with OneFS 9.2 preinstalled. The administrator connects the node to the cluster network and attempts to join it using the CLI. The join fails with a version mismatch error. What should the administrator do first?
Select an answer first - 4
After a node has been joined to a PowerScale cluster, the administrator notices that the node is listed as 'down' in 'isi status'. The node is powered on and has network connectivity. What should the administrator do first?
Select an answer first - 5
During the node discovery phase of joining a new node to a PowerScale cluster, what is the primary purpose of the discovery process?
Select an answer first