An administrator is planning an upgrade from Avamar 7.3 to 7.5. The official upgrade path documentation states that direct upgrades from 7.3 to 7.5 are not supported. What should the administrator do?
Select an answer first - 17
An administrator runs the pre-installation check and receives a warning about the system's network configuration. The warning indicates that the hostname does not resolve correctly. What should the administrator do?
Select an answer first - 18
Which of the following is a tool used to verify that Avamar prerequisites are met before installation?
Select an answer first - 19
A company is deploying a new Avamar server on physical hardware. The installation documentation specifies that the server must have a minimum of 64 GB of RAM and 2 TB of usable disk space. During the pre-installation check, the administrator discovers the server has 48 GB of RAM and 1.5 TB of free disk space. What should the administrator do before proceeding with the installation?
Select an answer first - 20
An organization is running Avamar 7.4 on a server with an OS that is supported by 7.4 but not by 7.5. The administrator wants to upgrade to 7.5. The upgrade path documentation states that 7.4 can be upgraded directly to 7.5. What should the administrator do?
Select an answer first
Finished these 5 questions?
Review the revealed explanations, or continue through the curriculum.
Free Basic Practice is a study aid with revealable answers — not a scored exam. Examers.io is independent and not affiliated with or endorsed by Dell Technologies. “AVAMAR-DEPLOY” is a trademark of its owner, used for identification only.