Part of the Network architecture design domain, which accounts for 31% of the CNX-001 exam. CompTIA does not publish an official question count, but from its 165-minute exam (~65–110 total, ~20–34 in this domain), expect 4–7 from this objective — we provide 20 practice questions to prepare you well beyond it. (estimate)

20questions here
4free pages
3concepts
31%of the exam

Questions 11–15

  1. 11application · medium

    A campus is installing network equipment in a room that will also be used as a storage area for cleaning supplies. The room has limited airflow and no dedicated cooling. The network team is concerned about the equipment overheating and potential damage from fumes. What should the team do?

    Select an answer first
  2. 12expert · hard

    A campus is installing a new network operations center (NOC) in a building that also houses a public cafeteria. The NOC will contain sensitive equipment and must be accessible only to authorized IT staff. The building has a single main power feed. The team wants to ensure that the NOC remains operational during a power outage. Which combination of controls best meets the security and power requirements?

    Select an answer first
  3. 13application · medium

    A campus is building a new data center wing. The electrical design includes two independent utility feeds and a UPS system. The network team wants to ensure that a failure of one utility feed does not affect the other. What is the most important design consideration?

    Select an answer first
  4. 14application · medium

    A manufacturing campus is installing network equipment in a warehouse area. The space has high ambient temperature, dust, and no dedicated HVAC. The network team must install a switch that supports PoE for security cameras. Which approach best addresses the environmental constraints?

    Select an answer first
  5. 15foundation · easy

    A campus network installation is being designed with a requirement that network services remain available during a utility power outage. Which power solution is specifically designed to provide temporary power until generators start or until systems can be shut down gracefully?

    Select an answer first
Finished these 5 questions?