
CiscoCertified Network Associate Automation (CCNA Automation)
Domain 1Objective 8
8. Utilize Common Version Control Operations with Git 200-901 Practice Questions (Page 4)
Part of the 1.0 Software Development and Design domain, which accounts for 15% of the 200-901 exam. Cisco does not publish an official question count, but from its 120-minute exam (~50–80 total, ~8–12 in this domain), expect 1–2 from this objective — we provide 38 practice questions to prepare you well beyond it. (estimate)
38questions here
8free pages
7concepts
15%of the exam
Questions 16–20
- 16
What is the primary purpose of a commit message in Git?
Select an answer first - 17
A developer wants to delete a file named old.py from both the working directory and the staging area. Which command should be used?
Select an answer first - 18
A network engineer is about to start a significant refactor of a Python script used for device configuration. The engineer wants to keep the current stable version intact while working on the refactor. Which Git operation should be performed first?
Select an answer first - 19
Which command shows the differences between two branches, for example 'main' and 'feature'?
Select an answer first - 20
A developer has modified a file 'inventory.yml' and wants to see the changes before staging. After reviewing, the developer decides to stage the file and commit it. Which sequence of commands accomplishes this?
Select an answer first
Finished these 5 questions?
Review the revealed explanations, or continue through the curriculum.
Free Basic Practice is a study aid with revealable answers — not a scored exam. Examers.io is independent and not affiliated with or endorsed by Cisco. “200-901” is a trademark of its owner, used for identification only.